Guastini Power Engineerings strongly present in Hwange Power Station collaborating with Zimbabwe Power Company from the 90’s, representing the OEMs on-site.
Some of the most relevant job successfully concluded in Hwange Power Station are:
Major Overhauls of UNIT 5 (2013)
New Excitation Systems U5&6 installation and maintenance
New Boiler Feed Pump relevant Motors installation on UNIT 5
New Digital Electr0-Hydralic Turbine Control system (DEHC) U5&6 installation and maintenance
Service Contract and maintenance of Turbine, Generator and Thermal Cycle, daily presence from 2009 with significant improvement of the Turbine availability
New Turbine Thrust Bearing upgrade on UNIT 5
Major Overhaul of UNIT 6 (2017)
Installation and Commissioning of new Feed Water Heaters on UNIT 6
Installation of the new Turbine Supervisory Instrumentation on UNIT 6
New Turbine Thrust Bearing upgrade on UNIT 6
Installation and maintenance of new Boiler Feed Water Pumps
Some of the works and upgrades expected to be completed:
Replacement of HP-IP and LP Rotors on UNIT 5
Major Overhaul of UNIT 5
Installation of New Feedwaters Heaters on UNIT 5
Installation of the new Turbine Supervisory Instrumentation on UNIT 5